![]() |
||
| Main responsible for EMR delivery of maintenance of passenger coaches |
|
| Client: EuroMaint Rail (EMR) 2007-2008 | |
| Railway container transports to/from a new container port in Norvik outside Stockholm. |
|
| Client: Ports of Stockholm 2006-2007 | |
| Rail vehicles and maintenance in Serbia |
|
| Client: ÅF Infrateknik 2006 | |
| No title |
|
| Client: Danish Railways 2006 | |
| No title | |
| Client: Skånetrafiken 2005 | |
| Contracting of Rolling Stock technical administration |
|
| Client: Swedish State Railways 2003-2005 | |
| X60 Maintenance Analysis |
|
| Client: Citypendeln (Keolis), Stockholm, Sweden 2004 | |
| Documents for operation of the Eskisehir Tramway (Turkey) |
|
| Client: Bombardier Transportation 2003-2004 | |
| Establishment of a Rolling Stock Unit at the Swedish State Railways |
|
| Client: Swedish State Railways 2003-2004 | |
| Analysis of a new intermodal transport system for Rail Combi |
|
| Client: Rail Combi 2003 | |
| Railway Rolling Stock Maintenance Services in Sweden |
|
| Client: Mantena AS (Norge) | |
| Railway Rolling Stock Maintenance Services in Sweden |
|
| Client: Siemens AB 2001 | |
| Roles and responsibilities for traffic safety and vehicle development. |
|
| Client: SJ (Swedish State Railways), BV (Swedish Railway Adminstration) 1998-2000 | |
| Workshop manual for A-Train |
|
| Client: A-Train (operator of Arlanda Express) 1999-2000 | |
| Strategic development plan for the Kosovo railways |
|
| Client: Swedish International Development Agency (through Hifab International) 2000 | |
| Regional train services over the Öresund bridge (Sweden-Denmark). |
|
| Client: Skånetrafiken 2000 | |
| Tender for the operation of the commuter train services in Stockholm, Sweden |
|
| Client: Via GTI (Keolis) – BK-tåg – Go Ahead Group 1998 | |
| Organisation of the technical sector |
|
| Client: The Swedish Railway Administration (Banverket, BV) 1997 | |
| Estonian Railway Regulatory Standards |
|
| Client: Swederail 1997 | |
| Cargo System 2000 |
|
| Client: SJ (Swedish State Railways) 1993-1996 | |
| Business plan |
|
| Client: ERRI (European Railway Research Institute), Holland 1996 | |
| Main responsible for EMR delivery of maintenance of passenger coaches | |
| During a period of 6 months EMR needed assistance to manage their maintenance of SJAB fleet of 441 passenger coaches. At the same time an improvement program should be carried out. The work included daily issues as regards the maintenance at the workshops, various problems management and technical problems etc. Among other things an internet based IT-tool to manage and monitor the maintenance production was developed. | |
| Railway container transports to/from a new container port in Norvik outside Stockholm. | |
| The Ports of Stockholms intend to relocate the container port in central Stockholm to Norvik in Nynäshamn. The study is an analysis of how railway transports of containers between Norvik and Stockholm/central Sweden could be designed in a competitive way compared to road transport. | |
| Rail vehicles and maintenance in Serbia | |
| Study in Serbia of all types of rail vehicles regarding their availability and maintenance. The study also includs proposals of improvements to get better efficiency | |
| No title | |
| Study of the possibility to decrease the number of train staff using other duty parameters than previously. | |
| No title | |
| No description | |
| Contracting of Rolling Stock technical administration | |
| Technical and commercial support in the public procurement ("LoU"), evaluation and contracting of the technical administration of the rolling stock. Continuation of the work to establish a rolling stock unit, additional business process analysis. | |
| X60 Maintenance Analysis | |
| Stockholm Local Transport (SL) is replacing old commuter trains with a new X60 type by Alstom requiring new schemes for maintenance and operation. In parallel a new depot is taken into operation. The analysis identifies how to operate and organise the maintenance system of the commuter train services, including necessary investments and other measures. | |
| Documents for operation of the Eskisehir Tramway (Turkey) | |
| Following previous work on system design of the new Eskisehir Tramway (Turkey), Transrail was assigned by the supplier (Bombardier Transportation) to draft the necessary documentation for mobilisation and operation of the system. | |
| Establishment of a Rolling Stock Unit at the Swedish State Railways | |
| Organisational analyis and establishment of a Rolling Stock Unit with the purpose of renting vehicles to operators. Vehicle take-over from SJ AB, rental contracts for operators, initial technical administration of the fleet. | |
| Analysis of a new intermodal transport system for Rail Combi | |
| Rail Combi (CargoNet), the main intermodal railway operator in Sweden, wanted to make a major change of their rail production scheme. Transrail analysed the planned train and wagon circulation, impacts on the wagon fleet and kilometre performance. Successfully solved using Transrail's TSDA tool with new software routines to minimise wagon empty runs. | |
| Railway Rolling Stock Maintenance Services in Sweden | |
| Mantena wanted to expand their business to Sweden. They needed to know who their potential customers are, a broader knowledge of the market and specific advance notice on maintenance procurements. Transrail helped them with this and the strategies for a Swedish establishment. | |
| Railway Rolling Stock Maintenance Services in Sweden | |
| In 2001 the Swedish government launched a process to sell EuroMaint, former technical division of SJ, and still Sweden’s largest railway rolling stock maintainer. During the international bidding Siemens Transportation contracted Transrail for part of the due diligence. After due consideration Siemens withdraw from bidding, and later on the selling process was stopped. | |
| Roles and responsibilities for traffic safety and vehicle development. | |
| Study performed as a step in the reorganisation of the state-dominated railway sector, to propose a future sector organisation regarding roles and responsibilities for traffic safety and vehicle development. The study used the aviation sector as a benchmark and was based on round table discussions with railway organisation representatives. | |
| Workshop manual for A-Train | |
| Writing of a depot manual for the Arlanda Express depot at Blackvreten. The manual covers the organisation of the depot, rules and routines of work, responsibilities, control activities, safety regulations and reviews. | |
| Strategic development plan for the Kosovo railways | |
| Review of the rolling stock and maintenance organisation of Kosovo railways, estimates on the need of different types of rolling stock and status of existing rolling stock. The study was part of a strategic development plan for Kosovo railways, carried out by Hifab International. | |
| Regional train services over the Öresund bridge (Sweden-Denmark). | |
| The train service over the Öresund bridge was originally set up as a cooperation between DSB and SJ (the Danish and Swedish national railways). In 2000 the responsibility on the Swedish side was transferred to the regional PTA. In preparing this transfer Skånetrafiken asked Transrail for a second opinion on the traffic prognosis and economy of the services. | |
| Tender for the operation of the commuter train services in Stockholm, Sweden | |
| Design of the offered trafic and maintenance system, including necessary resources. Citypendeln won the contract to operate the Stockholm commuter train services 2000-2005. | |
| Organisation of the technical sector | |
| Study on the future competence and organisation of the technical department within Banverket (BV), authority responsible for the Swedish railway infrastructure. A Rolling Stock unit was studied as a result of a reorganisation of the railway sector giving BV responsibility for the technical approval of new rolling stock. | |
| Estonian Railway Regulatory Standards | |
| Participation (rolling stock expertise) in an European Commission Phare-study for the Estonian railways on laws, regulations, standards etc. | |
| Cargo System 2000 | |
| Developing a vision for a future Swedish railway freight transport system. Focus on the potential of intermodal transport in comparison to other means of transport. Included extensive technical-economical studies of different modes. Transrail tool TSDA (Transport System Design and Analysis) was used. | |
| Business plan | |
| The research institute of the European railways was reorganised in 1996. Transrail prepared the new strategic business plan of the institute. | |