| Railenergy |
|
| Client: The Swedish Railway Administration (Banverket, BV) 2006- | |
| Management of high speed testing |
|
| Client: Botnia line 2008- | |
| Uppsala PRT |
|
| Client: Vectus 2006-2008 | |
| Technical Controller |
|
| Client: Veolia Transport Sverige 2006-2008 | |
| Simulator for training of train drivers in Chile |
|
| Client: Maestranza Central Ltda (Chile) 2007-2008 | |
| Energy saving program for Arlanda Express. Pre-study |
|
| Client: Arlanda Express 2007 | |
| Investigation of a collision in Nyköbing F |
|
| Client: DSB Sikkerhet 2007 | |
| Rule Book and Safety Test Instructions | |
| Client: Vectus 2006 | |
| CATO field tests |
|
| Client: The Swedish Railway Administration, LKAB 2004-2006 | |
| Safety revision of EuroMaint suburban train maintenance |
|
| Client: Stockholmståg 2006 | |
| Risk Analysis as regards introduction of new rolling stock and a new depot |
|
| Client: Citypendeln (Keolis), Stockholm, Sweden 2005 | |
| Documents for operation of the Eskisehir Tramway (Turkey) |
|
| Client: Bombardier Transportation 2003-2004 | |
| Authority Approvals of Coradia Duplex X40 |
|
| Client: Alstom Transport 2001-2005 | |
| Roles and responsibilities for traffic safety and vehicle development. |
|
| Client: SJ (Swedish State Railways), BV (Swedish Railway Adminstration) 1998-2000 | |
| Workshop manual for A-Train |
|
| Client: A-Train (operator of Arlanda Express) 1999-2000 | |
| Railenergy | |
| Railenergy is a research project within the EU R&D framework program. Transrail's part in the project is to manage a work package regarding energy efficient operation. This includes energy efficient driving and timetabling. | |
| Management of high speed testing | |
| Management of the high speed texting to verify railway functionality on the Botnia line. Specifications, procurement, test execution and reporting. | |
| Uppsala PRT | |
| Project management and system engineering of a PRT test track in Uppsala. Apart from many challenges, technical and others, Transrail is responsible to ensure the project target of a safety approval by the Swedish Rail Agency. | |
| Technical Controller | |
| Full time engagement as Technical Controller at the department for Safety and Technology. The department is responsible for maintenance and other aspects as regards the rolling stock used on the Stockolm underground and tramways, which are operated by Veolia. | |
| Simulator for training of train drivers in Chile | |
| Analysis of the potential for cost decrease and quality increase of driver training in Chile by the introduction of a driver simulator. | |
| Energy saving program for Arlanda Express. Pre-study | |
| Analysis of the potential for energi saving of Arlanda Express train operation, covering driving, auxiliary power and HVAC. | |
| Investigation of a collision in Nyköbing F | |
| Analysis of what happened at a shunting collision in Nyköbing F. | |
| Rule Book and Safety Test Instructions | |
| No description | |
| CATO field tests | |
| Computer Aided Train Operation, a R&D project financed by clients and Transrail, is intended to optimise train driving, thus reducing operational costs and enhancing line capacity. Analysing the full traffic situation drivers are given information on how to best drive their trains. Field tests are now done to verify and update the System Requirement Specification. | |
| Safety revision of EuroMaint suburban train maintenance | |
| System revision (safety audit) of EuroMaint Rail’s maintenance of the rolling stock in SL’s commuter train traffic. | |
| Risk Analysis as regards introduction of new rolling stock and a new depot | |
| Development of a risk analysis including mitigation strategies for the migration to new commuter trains in the Stockholm area, requiring new schedules for staff, maintenance and operation. At the same time, a new depot was to be taken into operation. | |
| Documents for operation of the Eskisehir Tramway (Turkey) | |
| Following previous work on system design of the new Eskisehir Tramway (Turkey), Transrail was assigned by the supplier (Bombardier Transportation) to draft the necessary documentation for mobilisation and operation of the system. | |
| Authority Approvals of Coradia Duplex X40 | |
| Management of the Authority Approvals Process for the new double-decker regional trains to SJ AB (Sweden). Establish an Approvals Dossier, with all authority requirements, set up the approvals process and assist the supplier to fulfil the requirements. | |
| Roles and responsibilities for traffic safety and vehicle development. | |
| Study performed as a step in the reorganisation of the state-dominated railway sector, to propose a future sector organisation regarding roles and responsibilities for traffic safety and vehicle development. The study used the aviation sector as a benchmark and was based on round table discussions with railway organisation representatives. | |
| Workshop manual for A-Train | |
| Writing of a depot manual for the Arlanda Express depot at Blackvreten. The manual covers the organisation of the depot, rules and routines of work, responsibilities, control activities, safety regulations and reviews. | |