![]() |
||
| Bid manager vehicle system engineering |
|
| Client: Bombardier Transportation 2005-2006 | |
| No title | |
| Client: Skånetrafiken 2005 | |
| Tender for the operation of Stckholm commuter trains |
|
| Client: Keolis SA 2005-2006 | |
| Tender for operation of the traffic system "Tåg i Bergslagen" |
|
| Client: Keolis SA 2005 | |
| Contracting of Rolling Stock technical administration |
|
| Client: Swedish State Railways 2003-2005 | |
| Uppsala C railway station | |
| Client: The PTA of Uppland 2005 | |
| Arlanda Express Settlement Agreement. |
|
| Client: A-Train (operator of Arlanda Express) 2002-2004 | |
| Establishment of strategic plan for the Rolling Stock |
|
| Client: Swedish State Railways 2004 | |
| Contracting of Rolling Stock heavy maintenance |
|
| Client: Swedish State Railways 2004 | |
| X60 Maintenance Analysis |
|
| Client: Citypendeln (Keolis), Stockholm, Sweden 2004 | |
| Maintenance of the Stockholm commuter trains in the future. |
|
| Client: Citypendeln (Keolis), Stockholm, Sweden 2003 | |
| Supervision of the delivery of the Arlanda Express vehicles |
|
| Client: A-Train (operator of Arlanda Express) 1997-2002 | |
| Tendering of a new generation commuter trains for Stockholm, Sweden. |
|
| Client: Alstom Transport 2001-2002 | |
| Software tool to evaluate operational and maintenance statistics |
|
| Client: A-Train (operator of Arlanda Express) 1999-2002 | |
| Requirement specification for a new generation ticketing systems for SL |
|
| Client: SL (Stockholm Public Transport Authority) 2001 | |
| Review of the Yugoslavian Railways for a rebuilding plan |
|
| Client: Swedish International Development Agency (through Hifab International) 2001 | |
| Authority Approvals of Coradia Duplex X40 |
|
| Client: Alstom Transport 2001-2005 | |
| Railway Rolling Stock Maintenance Services in Sweden |
|
| Client: Siemens AB 2001 | |
| Support on tendering for SJ Regional Trains (X40) |
|
| Client: Alstom Transport 2000 | |
| Support on tendering for Gothenburg Tramways |
|
| Client: Alstom Transport 2000 | |
| Support on tendering of DMUs for Jönköping |
|
| Client: Alstom Transport 1999-2000 | |
| Project management for the aquisition of new vehicles |
|
| Client: Swedish State Railways (SJ) and Stockholm Local Transport 1999 | |
| Tender for the operation of the train services Malmö-Gothenburg, Sweden |
|
| Client: Via GTI (Keolis) – BK-tåg – Go Ahead Group 1998-1999 | |
| Tender for the operation of the commuter train services in Stockholm, Sweden |
|
| Client: Via GTI (Keolis) – BK-tåg – Go Ahead Group 1998 | |
| Specification for refurbishment of suburban trains. |
|
| Client: SL (Stockholm Public Transport Authority) 1998 | |
| Eurotrains II |
|
| Client: Community of Nordic Railways (DSB, NSB, SJ, VR) 1997 | |
| Life Cycle Cost (LCC) study. |
|
| Client: Fiat Ferroviaria SpA, Italy 1997 | |
| Eurotrains |
|
| Client: The Community of Nordic Railways (DSB, NSB, SJ, VR) 1994-1996 | |
| Eurotunnel shuttle traction and rolling stock |
|
| Client: Eurotunnel, UK 1996 | |
| Maintenance of Copenhagen Minimetro Rolling Stock |
|
| Client: Carl Bro Industri & Marine as, Copenhagen | |
| Bid manager vehicle system engineering | |
| Bid manager for system engineering (vehicles). During the assignment proposals for Rome Line C, Flytoget internediate cars (Norway), Budapest Metro and Iran Metros were produced. | |
| No title | |
| No description | |
| Tender for the operation of Stckholm commuter trains | |
| Project management and other consultancy participation for Keolis tendering for this contract, including traffic and station services. | |
| Tender for operation of the traffic system "Tåg i Bergslagen" | |
| Participation in Keolis tender for the regional passenger services in Bergslagen (middle Sweden). Transrail made the staff schedules and traffic plans, rolling stock circulations and maintenance parts of the tender. Transrail also conducted a SWOT-analysis and a pre-study prior to the tender. | |
| Contracting of Rolling Stock technical administration | |
| Technical and commercial support in the public procurement ("LoU"), evaluation and contracting of the technical administration of the rolling stock. Continuation of the work to establish a rolling stock unit, additional business process analysis. | |
| Uppsala C railway station | |
| No description | |
| Arlanda Express Settlement Agreement. | |
| Management of the Settlement Agreement action plan to finalise the delivery of the rolling stock. The plan included technical issues to be finalised by the supplier in order to receive customer acceptance. | |
| Establishment of strategic plan for the Rolling Stock | |
| Establishment of strategic plan for the rolling stock, with recommendations on financially viable renovations and status upgrades. The work included also the establishing of maintenance programmes and take over of technical documentation. | |
| Contracting of Rolling Stock heavy maintenance | |
| Technical and commercial support in the public procurement ("LoU"), evaluation and contracting of heavy maintenance. In addition establishment of maintenance programmes, analysis of material need and compiling + creation of maintenance documentation. | |
| X60 Maintenance Analysis | |
| Stockholm Local Transport (SL) is replacing old commuter trains with a new X60 type by Alstom requiring new schemes for maintenance and operation. In parallel a new depot is taken into operation. The analysis identifies how to operate and organise the maintenance system of the commuter train services, including necessary investments and other measures. | |
| Maintenance of the Stockholm commuter trains in the future. | |
| Study on the future conditions for maintenance of the Stockholm commuter trains, considering the migration to a new fleet witch is not compatible with the old vehicles and the introduction of a new second depot. | |
| Supervision of the delivery of the Arlanda Express vehicles | |
| In 1997 A-Train engaged Transrail to assist in customer management of the GEC-Ahlstom (Alstom) delivery of the Arlanda Express shuttle trains. Reviewing design, manufacturing and project schedule Transrail staff also supervised manufacturing and type/commissioning tests, and before traffic start identified and supervised necessary modifications of the trains | |
| Tendering of a new generation commuter trains for Stockholm, Sweden. | |
| Alstom contracted Transrail to support the successful tendering for a new generation commuter trains in Stockholm. Support on strategic issues, local conditions, drafting parts of the technical offer (incl the design booklet), translation of the tender, and in negotiations. | |
| Software tool to evaluate operational and maintenance statistics | |
| During the first years of operation of the Arlanda Express, Transrail managed the reliability monitoring programme. Information on traffic and vehicle disturbances from drivers, the traffic control centre and the workshop was compiled in a database, enabling analysis of train and subsystem reliability, traffic consequences and maintenance actions. | |
| Requirement specification for a new generation ticketing systems for SL | |
| Based on our experience to handle project aspects on aesthetic and functional design, Transrail was commissioned to develop the design requirement specification for the purchase of a Smart Card ticketing system by SL. | |
| Review of the Yugoslavian Railways for a rebuilding plan | |
| This project to define a short term international investment plan for Yugoslavian Railways was commissioned by the Swedish International Development Agency. Transrail made technical reviews of infrastructure, rolling stock and maintenance facilities, and project prioritisation. | |
| Authority Approvals of Coradia Duplex X40 | |
| Management of the Authority Approvals Process for the new double-decker regional trains to SJ AB (Sweden). Establish an Approvals Dossier, with all authority requirements, set up the approvals process and assist the supplier to fulfil the requirements. | |
| Railway Rolling Stock Maintenance Services in Sweden | |
| In 2001 the Swedish government launched a process to sell EuroMaint, former technical division of SJ, and still Sweden’s largest railway rolling stock maintainer. During the international bidding Siemens Transportation contracted Transrail for part of the due diligence. After due consideration Siemens withdraw from bidding, and later on the selling process was stopped. | |
| Support on tendering for SJ Regional Trains (X40) | |
| Local assistance during the tendering phase of the X40 Regional Trains. Transrail commented the customer's requirement specification, gave information on their likely preferences and informed on other conditions for a successful bid. The order was won by Alstom Transport. | |
| Support on tendering for Gothenburg Tramways | |
| Together with our partner Idesign, we prepared a Design Booklet, presenting the offered tram "Bris" based on Alstom's Citadis concept. | |
| Support on tendering of DMUs for Jönköping | |
| Preparation of a Design Booklet, presenting the offered DMU. The work was done together with the French company Avant Premier and Idesign, our Swedish partner on Industrial Design. | |
| Project management for the aquisition of new vehicles | |
| In 1999 Swedish State Railways (SJ) and Stockholm Local Transport (SL) started a joint project for the acquisition of new electrical multiple units. Transrail was contracted to carry out management of the project. | |
| Tender for the operation of the train services Malmö-Gothenburg, Sweden | |
| Design of the traffic system for the Swedish west coast mainline Malmö-Gothenburg, construction of vehicle circulation patterns etc. Estimates on the required number of rolling stock. Advice on rolling stock maintenance issues. | |
| Tender for the operation of the commuter train services in Stockholm, Sweden | |
| Design of the offered trafic and maintenance system, including necessary resources. Citypendeln won the contract to operate the Stockholm commuter train services 2000-2005. | |
| Specification for refurbishment of suburban trains. | |
| Drafting of a specification for the modernisation of existing suburban trains in the Stockholm area. | |
| Eurotrains II | |
| Support to CNR (The Community of Nordic Railways) as regards initiatives for development of the "Eurotrains", a concept for a new generation of flexible modular passenger trains. | |
| Life Cycle Cost (LCC) study. | |
| Conducting an early Life Cycle Cost (LCC) study for a rolling stock tender. | |
| Eurotrains | |
| Development of a strategy for future passenger rolling stock and acquisitions to the Scandinavian railways. "Eurotrains" was a concept for a new generation of flexible modular passenger trains. A copy of the Eurotrains booklet may be downloaded from our site. | |
| Eurotunnel shuttle traction and rolling stock | |
| Independent review of the fitness for purpose of the traction and rolling stock. | |
| Maintenance of Copenhagen Minimetro Rolling Stock | |
| Participation in tender evaluations and contracting for the new Copenhagen Minimetro total rail project. Transrail was responsible for the Rolling Stock maintenance aspects. | |